St Johns 5th Floor


These pictures include patient room showers, vanity tops/splashes, patient room nurse’s preparation tops/splash, and nurses stations all clad in DuPont Corian. Note the 1” thick wall between the shower and vanity top that is a prefabricated solid DuPont Corian wall. This project installation took over 3 months to complete and utilized over 500 sheets of Corian.

Call for a free in home consultation